
Whitehouse, Texas · When time is of the essence.
Stone counters
in two weeks.
Pick the slab, we template, fabricate, and install. No two-month wait. Free in-home measure across East Texas.
- Two-week installs
- 5.0 from 71 reviews
- 10-year workmanship warranty
- Free in-home measure
What we do
Counters. That’s the shop.
Granite, quartz, and quartzite from measure to set. Tile that meets the stone, repair when the slab is still good, and a full kitchen or bath if you want one crew instead of three.

Countertops
Measure, template, cut, and install. Most kitchens finish in two weeks.

Repair, polish & seal
Chips, dull marble, tired granite — often cheaper than a full tear-out.

Tile
Backsplashes, showers, and floors that actually line up with the stone.

Whole kitchen or bath
If cabinets and tile have to move with the tops, we run it as one job.
The stone
You pick the actual slab — not a four-inch sample.
Granite, quartz, quartzite, marble, and butcher block from MSI, Cambria, Silestone, and the local yard. We walk it with you.
MSI · Cambria · Silestone · Corian
Recent work
Kitchens, baths, patios, and the odd party barn.

Navy kitchen, wood island
Jacksonville, TX · Black Diamond quartzite

The same kitchen, from the floor
Jacksonville, TX · Black Diamond quartzite

Island veining
Jacksonville, TX · Black Diamond quartzite

Stone to the windows
Jacksonville, TX · Black Diamond quartzite

Eased edge
Jacksonville, TX · Black Diamond quartzite

Butcher-block pantry
Jacksonville, TX · Butcher block
Neighbors, not testimonials-as-a-service
5.0 stars. 71 reviews. Still a small crew.
“The Rapid Granite team installed beautiful quartzite and butcher block countertops as well as bathroom tile in my new home. I love it.”
Heath Foreman
Hideaway, TX
“Our project was not easy. Existing granite that needed repairs, plus a few unique problems. The team didn’t blink. The kitchen looks amazing.”
Susan Haley
Frankston, TX
“Kitchen and bath countertops look amazing, as does the tile backsplash. Extremely polite and communicative the whole way through.”
Shea Tucker
Kitchen & bath
“The shop gave us a couple of options to restore a tired marble vanity instead of refinishing the whole thing. Huge difference. They know natural stone.”
Scott Barrett
Marble restoration
Two weeks, not two months
Measure. Pick a slab. Template. Cut. Set.
01
Call or plan a project
Tell us the room, the material you’re leaning toward, and the city. We’ll set a free in-home measure.
02
Walk the slab yard
You pick the actual slab — not a four-inch sample. Lighting in the yard is honest. We help you read movement and seams.
03
Template
Digital template of the cabinets, sinks, and cooktop. This is where edges, overhangs, and splash height get locked.
04
Fabricate
CNC and diamond tooling in the shop. Cutouts, polish, and quality check before anything rolls to your house.
05
Install
Usually a one-day set. We protect floors, seam with care, and leave the site clean. Most jobs wrap inside two weeks of template.
Towns, not a county loop
Tyler, Lindale, Hideaway, Bullard — each gets its own page.
Drive time from the Whitehouse shop, the work we actually do there, and a quote that already knows your city.

Free in-home consultation
Ready when you are.
Call, text, or request a quote. We’ll tell you honestly if two weeks is realistic for your job.



